Location | Pilatus Kulm, Alpnach OW |
Client | PILATUS BAHNEN AG, KRIENS |
Commission | Competition on invitation 2008 |
Planning | 2008–2010 |
Construction | 2010–2011 |
Architects | Graber & Steiger Architekten, Project Architect: Philip Käslin |
Consultants | Construction manager: Jürg Gabthuler, Structural engineer: Dr. Schwartz Consulting, Cost management: Büro für Bauökonomie, Façade engineering: Metallprojekt GmbH |
Photographer | D.M. Wehrli |
The impressive, crystalline silhouette of the Pilatus massif was integrated into the design for the panorama gallery and developed further in an architectural form. The new structure is subtly fitted into the Alpine terrain and develops between existing buildings and striking rocky outcrops into an artificial topography. The polygonal, meandering ground plan and the gentle cross-sectional modulation are spatial strategies that evoke gentle transitions between the developed and undeveloped landscape. The polygonal connecting section choreographs a series of spectacular perspectives and breath-taking viewpoints, while also acting as a perceptive amplifier that stages the reference to the landscape to the fullest extent. The underlying crystalline theme of the volumetrics is also reflected in the structure, construction and materialisation, and is based on a hybrid steel and concrete composite system.
The ground-breaking ceremony for the new school building in Nottwil was held on the 22nd of June 2016. The design is based on the winning project from a competition held in 2015. It takes the form of a wooden extension to the existing village school site. The first stage of the linear development is now underway along the slope and will house the primary school and two kindergartens from summer 2017.