Location | Pilatus Kulm, Alpnach OW |
Client | PILATUS BAHNEN AG, KRIENS |
Commission | Competition on invitation 2008 |
Planning | 2008–2010 |
Construction | 2010–2011 |
Architects | Graber & Steiger Architekten, Project Architect: Philip Käslin |
Consultants | Construction manager: Jürg Gabthuler, Structural engineer: Dr. Schwartz Consulting, Cost management: Büro für Bauökonomie, Façade engineering: Metallprojekt GmbH |
Photographer | D.M. Wehrli |
The impressive, crystalline silhouette of the Pilatus massif was integrated into the design for the panorama gallery and developed further in an architectural form. The new structure is subtly fitted into the Alpine terrain and develops between existing buildings and striking rocky outcrops into an artificial topography. The polygonal, meandering ground plan and the gentle cross-sectional modulation are spatial strategies that evoke gentle transitions between the developed and undeveloped landscape. The polygonal connecting section choreographs a series of spectacular perspectives and breath-taking viewpoints, while also acting as a perceptive amplifier that stages the reference to the landscape to the fullest extent. The underlying crystalline theme of the volumetrics is also reflected in the structure, construction and materialisation, and is based on a hybrid steel and concrete composite system.
The current issue 13/2022 of TEC21 introduces the mixed-use conversion on Denkmalstrasse in Lucerne. Among others, the report highlights how the specific concept of the building achieves a lofty spatial openness despite a highly dense urban context and how the simple and raw spaces invite to a playful appropriation for living and working. Minimalism as an offer!